Transparent pricing, no hidden fees. Every quote is fixed-price — what we quote is what you pay. Send us photos and we'll give you an exact price before any work starts.
Step 1 — Get in Touch
Step 2 — Quick Online Assessment
Step 3 — Fast Quote
Step 4 — Book a Time
Step 5 — Professional Installation
Step 6 — Ready to Charge
These are indicative price ranges for Christchurch installations. Your exact price depends on your property and specific requirements. We always provide a fixed quote before starting work.
Every EV charger installation we do in Christchurch includes the following as standard — no surprises and no add-ons you didn't ask for.
Photo-based quote — you send us photos and we confirm charger location and switchboard capacity remotely
Registered electrician — all work done by a licensed professional
Charger mounting — securely fixed to wall at the right height
Circuit protection — correct breaker installed in your switchboard
Clean finish — conduit used where cables are exposed, all penetrations sealed
Full test — polarity, earth continuity, function test with your vehicle
Certificate of Compliance — issued the same day, required by NZ law
The installation prices above are for labour and materials only. The charger unit itself is additional. Below are the smart EV wall chargers we supply and install across Christchurch — all single-phase, WiFi-enabled, and fully compatible with Type 2 EVs.
6m cable & WiFi — 7.2kW. Built-in Dynamic Load Balancing, app control, scheduled charging.
7.4kW single-phase. NZ-designed, WiFi connected, OCPP compatible. Simple and reliable.
7kW, 32A, single-phase. Smart grid connect with WiFi and app scheduling.
7kW, single-phase with built-in load balancing. Best value DLB option.
New dedicated circuit from switchboard: Add $300 – $450
Labour: $500 – $700 (4–6 hours)
Charger unit cost is additional. We'll give you an exact quote before any work starts.
Charger unit prices only. All prices include GST. We can supply and install any of these units, or install a charger you've already purchased.
Most installations fall within the price ranges above. A few things can push costs higher:
Long cable runs — if the switchboard is at the front of the house and the garage is at the back, the cable run may be 30m+. More cable = more cost.
Switchboard upgrade — old fuse boards or full switchboards need upgrading before a new circuit can be added. This adds $1,500–$2,000 but is money well spent.
Trenching — if the cable needs to go underground to reach a detached garage, trenching is required. We'll quote this separately.
Three-phase charger — if you want a 22 kW three-phase charger, this needs three-phase power at your property and more complex wiring. We can advise.
Most modern switchboards can handle a 7.4 kW EV charger without any trouble — you just need a spare circuit. Older fuse boards (pre-RCD) often need upgrading, and we'll tell you upfront if that's the case. Adding a 32A circuit for a Type 2 charger is straightforward electrical work for a registered electrician.
With a 7.4 kW home charger and standard Canterbury electricity rates (approx. $0.30/kWh):
Nissan Leaf (40 kWh):
~$12 for a full charge
Tesla Model 3 (60 kWh):
~$18 for a full charge
BYD Atto 3 (60 kWh):
~$18 for a full charge
Compare to $80–$100+ to fill a petrol tank. The charger pays for itself fast.
Every property is different. Send us photos for a free quote, or fill in the form below.
021 194 9138 Free Online Quote